Home/Safety/EM 385-1-1 Compliance
2024 EM 385-1-1 USACE/NAVFAC Accident Prevention Plan Template
$395.00
- Built for the current APP form: ENG Form 6293 (Aug 2024)
- Expanded, prefilled narrative responses to help you complete required sections faster
- Editable APP appendices with a ready-to-complete structure
- “Minimum required plans” selection aid to help you identify what applies to your project
- Organized forms package (logs, inspections, training, toolbox talks, and more)
- Included PDFs: partially prefilled ENG Form 6293, ENG 6282 (SSHO Designation Letter), and ENG 3394 (Mishap Notification & Investigation)
- VIEW SAMPLE: 2024 EM 385 ENG-Form-6293 APP
Description
What’s included in your Template Package
Download a complete, organized APP submittal toolkit (ENG 6293 + companion narratives + appendices + templates + forms) built for the 2024 EM 385-1-1 update.
1) Ready-to-Complete APP Form (ENG Form 6293)
- Accident-Prevention-Plan_Eng_Form_6293_Aug-2024.pdf — partially prefilled, ready-to-complete
2) Expanded Responses (Companion Narrative)
- Expanded-Responses_Accident-Prevention-Plan_ENG-Form-6293.docx
- Copy-ready narrative responses for key ENG 6293 sections, including:
- Part 4: SOH Commitment & Policy
- Part 6: SOH Inspections
- Part 9: Severe Weather Plan
- Part 10: Activity Hazard Analysis (Risk Management)
- Part 12: Project Site Coordination (includes the coordination procedure customers must answer)
3) APP Appendices (Ready-to-Complete Structure)
- Accident-Prevention-Plan_Part-13_Appendices.docx
- Organized appendices structure for common submittal attachments:
- Project Map
- Subcontractors / Suppliers
- Qualifications / Designations
- AHAs
- Site-specific plans / procedures
- Forms
4) Supporting Plans & Procedures Templates (Fill Only What Applies)
- Appendix-5-Supporting-Plans-and-Procedures-Templates.docx
- Drop-in templates for common ENG 6293 supporting plans and procedures
- Designed so you can complete only what your project scope requires
5) Minimum Plans Required by EM 385-1-1 (Option Selection Aid)
- Part-11_Minimum-plans-required-by-EM-385-1-1_worksheet.docx
- Option-based worksheet (Option 1 / 2 / 3) to select minimum required plans
- Includes justification language for “not applicable” or “pending” items
6) Forms Package (Jobsite Admin Forms)
- Appendix-6-Additional-Forms.docx
- Editable logs and forms (inspections, first aid, training, toolbox talks, PPE issuance, visitor log, and more)
Plus these included USACE PDFs
- SSHO-Designation-Letter_Eng_Form_6282_2023Aug28.pdf — ENG Form 6282
- MISHAP-NOTIFICATION-AND-INVESTIGATION_Eng_Form_3394_2021Aug.pdf — ENG Form 3394
How it works (simple workflow)
- Start with ENG Form 6293 (PDF) and fill project/company basics.
- Use the Expanded Responses companion to complete narrative sections quickly.
- Select required plans using the Minimum Plans worksheet (Option 1/2/3).
- Complete Appendix 5 only where applicable (leave placeholders until site specifics are confirmed).
- Attach supporting documents (map, subcontractor list, designations/qualifications, AHAs, and forms).
Who this is for
- Prime contractors preparing an APP for USACE work
- Experienced contractors who want a 2024 EM 385-1-1 compliant update without reinventing their entire safety system
- Teams who want a clean, reviewer-friendly package that saves admin time
Need fully written Risk Plans and AHAs?
This $395 package gives you the template system and prefilled content to move fast.
If you want a “done-for-you” submittal-level deliverable, we also offer add-on services:
- Fully written Risk Plans (based on your project scope and EM 385 plan triggers)
- Project-specific Activity Hazard Analyses (AHAs) for your definable features of work
- Review + QA pass before submission
FAQ
Is this “accepted by USACE” out of the box?
USACE acceptance depends on your contract scope, site conditions, and KO/COR review.
This package is designed to help you produce a complete, organized, and EM 385-1-1-aligned APP submittal more efficiently.
What do I still need to fill in?
You’ll still add project-specific information like site map details, emergency contacts, subcontractor lists, and activity-specific hazards/controls.
The package is structured so you can keep placeholders until you confirm site specifics.
Can I reuse this for future projects?
Yes—this is a template package. Update the project placeholders, required plans, and attachments for each job.
Request a Quote for Risk Plans & AHAs
Prefer a fully written package? We can prepare the risk plans and AHAs for your exact project scope.





